Search This and my other Blogs

Wednesday, 13 May 2009

Part 5

the roof strips and dormer taped together
the strips glued on and taped together (for lack of clamps)
shrinkage to be fixed above the bricks
the dormer inside
the dormer walls covered with paper clay
the dormer front covered with paper clay
the whole side wall covered with paper clay
the front also covered
Rik is building the chimney with stones and brick (engraved in paper clay)
the front strip of the wall covered

No comments:

Post a Comment

Thank you so much for stopping by and leaving a comment. I appreciate your friendship.

However, comments with the purpose of (hidden) advertising will not be considered genuine and will be removed.